Editors' Picks | The Sanmenxia Water Control Project has increased the discharge volume.

中国青年报客户端  |  2025-07-08作者:王玉 王梓元

The Sanmenxia Hydroelectric Project has increased its discharge flow to 2,800 cubic meters per second to support the 2025 Yellow River water and sediment regulation, creating a high-flow process to scour sediment deposits in the river channel and assist the Xiaolangdi Reservoir in flushing out sand.🌊

#explore#construction#environment

By Wang Yu, Wang Ziyuan, Fan Xizhuo(Intern) and Du Jie / China Youth Daily

责任编辑:叶雨婷   编辑:何欣