Editors' Picks | 750 kV Power Grid Project Encircling Xinjiang's Tarim Basin Fully Connected

中国青年报客户端  |  2025-07-15作者:王玉 王梓元

On July 13th, in Minfeng County, 🏡Hotan Prefecture, on the southern edge of the Tarim Basin in Xinjiang, the 750 kV transmission and transformation project encircling the basin achieved full connectivity. This milestone marks the completion of the 15-year-long project, after the final section of power line was successfully pulled by a traction machine from tower #183 to tower #188. The project has now formed a 750 kV ultra-high voltage (UHV) transmission ring network encircling the Tarim Basin. #Xinjiang#WestChinaDevelopment#DesertPower

By Wang Yu, Wang Ziyuan, Sun jiamin(intern) and Ma yuan/China Youth Daily 

Source:Xinhua News Agency


责任编辑:叶雨婷   编辑:朱宏利